The Witnessing process for Schedules also applies for the Condition History records (ECHs) (see the flow diagram above).
Mark Equipment Condition History (ECH) Records for Witnessing
It is advised that an ECH, which has Schedules marked for Witnessing, should be marked for Witnessing as well. The Witnessing boxes are automatically checked for an ECH that is credited with a “Witness Schedule”. However the Witnessing boxes can be unchecked if not required.
Each user that have privileges to edit an ECH can mark the ECH for Witnessing. The steps are the same as for Schedules.
To set Witnessing Supervision and/or Authority for an ECH:
Select the Final Approved Schedule.
Create a new ECH for this Schedule.
Take Note that the boxes for Supervision and Authority are checked.

Fill in the rest and click Save.
You can also edit an existing ECH to add or remove the checks in the Witnessing boxes. Note: On already final Approved ECHs, the checkboxes cannot be checked. Supervision and/or Authority can only be checked when there is a pending event.

Final Approve the ECH
Before the Witnessing process can commence, the ECH must be Final Approved.

In case of recurring inspection Schedules a new Scheduled will automatically be created and Admin Final Approved. Also this Schedule will have the Witnessing boxes checked. The Schedule’s NID will be calculated from the Schedule Interval. If a different NID is required this can be indicated via the ECH Supervision / Authority Legal/Local Inspection date.
Initiate the Witnessing - Indicate the purpose of the activity
If this stage is enabled, the Initiator process for ECHs is similar to the Witnessing Initiation for Schedules.
Do the Supervision Review
The Supervision review process for ECHs is similar to the Supervision review of Schedules.
Legal/Local Inspection date
In addition the Legal/Local Inspection date field can be shown on either the ECH Authority form or on the Supervision form. If on the Supervision form, then the Supervisor determines the Legal NID during the review and enters this into the Legal/Local Inspection date. Subsequently this date is reviewed and approved by the Authority. This is the date by which the next re-examination must be submitted at the latest.

IMS can be used to generate a “VVH” report that allows a Statement of Re-Examination to be generated for an ECH. The prerequisites for generating this report are:
The ECH has a Legal/Local Inspection date filled in; and
The ECH has an Authority approval.
The Authority Approval is inherently also the approval of the Legal/Local Inspection date. Thus after Authority Approval, if this date differs from the next Schedule’s NID, it is the responsibility of the Inspector to update the next Schedule’s NID to align with this Legal/Local Inspection date.
Do Authorized ECH Witnessing
Once the ECH is reviewed successfully (Supervised), the next step is for the Authority to add Witnessing Approval to the ECH. This is similar to Schedule Witnessing.
Add an Authority record, by selecting the following options:
Field | Options | Comment |
|---|---|---|
Approval | Disapprove* | Always add a Comment in the Comment field. (Note: An additional Approval cycle is needed.) |
Approve | Add add a Comment | |
More information required* | Always add a Comment in the Comment field. (Note: An additional Approval cycle is needed.) | |
NCR | Check if Non-Conformance Report is required. | Once checked, additional NCR fields (NRC Closed + Comment) appear. |
Comment | Add a Comment to support the option the was selected in the Approval field. | |
NCR Impact | Minor | No risk to the integrity of pressure Equipment or the coherence of the management system. |
Major | Risk for the integrity of pressure Equipment and/or the coherence of the management system. | |
Attention | Not used everywhere. | |
NCR Closed | Check when the Non-Conformance Report is closed. | The details on how the Non-Conformance was resolves can be specified in the Comment field. |
Comment | Specify the requirements and evidence from the NCR, to support the closing of the NCR. | |
Legal/local Inspection date | The Legal/Local Inspection date field can be shown on either the ECH Authority form or on the Supervision form. If on the Authority form, then the Authority enters the Legal/Local Inspection date. After Authority Approval, if the Legal/Local Inspection date differs from the next Schedule’s NID, it is the responsibility of the Inspector to update the next Schedule’s NID to align with this Legal/Local Inspection date. |
*When “Disapproved”, or “More information required” is specified:
The ECH is still Final Approved, but
The Inspector should Review the ECH: Edit the ECH to modify and add information in order to comply to the conditions set by the Authority.
After the changes were made, the Inspector must again Final Approve the ECH.
A new review (i.e., Supervisor Approval) and Authority Approval round is required. Note: The initial Witnessing review information from the Supervisor and Authority is kept for reference but is greyed out.
To see an example of where the Authority Disapproved click the dropdown.

Important
Approval of the ECH should only be done if the applicable documents/reports have been added and shared correctly.