- Print
- DarkLight
- PDF
AW (Authority Witnessing B.V.) Dashboard
The Witnessing functionality has been developed for sites requiring documented Approvals of inspection activities. Witnessing is a specific feature for additional supervision and authority reviews on Schedules and ECHs, besides the regular Approval flow.
The Authority Witnessing B.V Dashboard contains a number of sections, showing information on the Inspection Schedules, CAIRs and ECHs marked for Witnessing. The information shown is listed in the table below. Each Query provides a list (or lists) of Schedules/ECHs. Navigate to the lists by clicking on the links.
For more information on how to use the Witnessing dashboards see Using the Witnessing Dashboards.
AW Dashboard information:
Supervision – Authorization Required | |
---|---|
Schedule | Inspection Schedules marked for Supervision by a Sr Insp/Eng. Batch update is available to do batch Approve. |
CAIR | CAIRs marked for Supervision by a Sr Insp/Eng. Batch update is available to do batch Approve. |
ECH | ECHs marked for Supervision by a Sr Insp/Eng. Batch update is available to do batch Approve. |
Supervision - Schedule Authorization Overview – This includes both Inspection Schedules and CAIRs | |
Scope reviewed | Supervised Schedules |
Scope Reviewed - Disapproved by Supervisor | Disapproved Schedules by Supervisor. A review is required by the Inspector. |
Scope Reviewed - Invite Authority for Field Inspection | Schedules for which the Inspector should invited the Authority to do a Field Inspection together. |
Scope Reviewed - Disapproved by Authority | Disapproved Schedules by Authority. A review is required by the Inspector. |
Scope Reviewed - Assigned NCR's by Authority | Schedules with NCRs assigned by the Authority. A review is required by the Inspector. |
Scope Reviewed - Assigned NCR's by Authority Closed | Schedules with closed NCRs. A review is required by the Inspector. |
Supervision - ECH Authorization Overview | |
ECH Reviewed | Supervised ECHs |
ECH Reviewed - Disapproved by Supervisor | Disapproved ECHs by Supervisor. A review is required by the Inspector. |
ECH Reviewed - Disapproved by Authority | Disapproved ECHs by Authority. A review is required by the Inspector. |
ECH Reviewed - Assigned NCR's by Authority | ECHs with NCRs assigned by the Authority. A review is required by the Inspector. |
ECH Reviewed - Assigned NCR's by Authority Close | ECHs with closed NCRs. A review is required by the Inspector. |
Authority - Authorization Required | |
Schedule | Inspection Schedules marked for Authority Witnessing. Batch update is available to do Batch Approve. |
CAIR | CAIRs marked for Authority Witnessing. Batch update is available to do Batch Approve. |
ECH | ECHs marked for Authority Witnessing. Batch update is available to do Batch Approve. |
Authority - Schedules Authorization Overview – This includes both Inspection Schedules and CAIRs | |
No Review Required | Schedules that don’t require a review |
Scope Reviewed - No Field inspection | Authorized Schedules |
Scope Reviewed - Field Inspection Together | Authorized Schedules for which a Field Inspection was requested (together). The Inspector must do a Filed Inspection and invite the Authority. |
Scope Reviewed - Field Inspection Later | Authorized Schedules for which a Field Inspection was requested (individual). The Inspector must do a Filed Inspection, but don’t need to invite the Authority. |
Scope Reviewed - More Information Required | Authorized Schedules where addition information is required (content not entirely clear). A review is required by the Inspector. |
Scope Reviewed - Disapproved | Disapproved Schedules. A review is required by the Inspector. |
Scope Reviewed - NCR Applied | Schedules with NCRs assigned by the Authority. A review is required by the Inspector. |
Scope Reviewed - NCR Closed | Schedules with closed NCRs. A review is required by the Inspector. |
Authority - ECH Authorization Overview | |
ECH Reviewed | ECH’s reviewed by Authority |
ECH Reviewed - More Information Required | Authorized ECHs where addition information is required (content not entirely clear). A review is required by the Inspector. |
ECH Reviewed - Disapproved | Disapproved ECH’s. A review is required by the Inspector. |
ECH Reviewed - NCR Applied | ECHs with NCRs assigned by the Authority. A review is required by the Inspector. |
ECH Reviewed - NCR Closed | ECHs with closed NCRs. A review is required by the Inspector. |