• Beta
Fabric Maintenance Hierarchy
  • 18 Nov 2024
  • 1 Minute to read
  • Contributors
  • Dark
    Light
  • PDF

Fabric Maintenance Hierarchy

  • Dark
    Light
  • PDF

Article summary

The figure below shows the important objects in the Fabric Maintenance (FM) Hierarchy.  

FM Hierarchy

An AREA-FLOC can be used to group multiple FLOCs together. In turn each FLOC can contain an Equipment (sometimes more than one). Alternatively you can also directly assign AREA Equipment (Equipment Group = "AREA") to the AREA-FLOC.

Schedules and Conditions Histories (ECHs) are created on Equipment level. An Equipment can have multiple Schedules and ECHs. On the AREA Equipment Details Page you will see all the Schedules and ECHs in that area, thus also those assigned to the other Equipment under the AREA-FLOC.

Lastly multiple Schedules (from multiple Equipment) can be linked to a Planned Event.


Was this helpful? Click to add feedback comments

What's Next
Changing your password will log you out immediately. Use the new password to log back in.
First name must have atleast 2 characters. Numbers and special characters are not allowed.
Last name must have atleast 1 characters. Numbers and special characters are not allowed.
Enter a valid email
Enter a valid password
Your profile has been successfully updated.
ESC

Eddy AI, facilitating knowledge discovery through conversational intelligence