Aim
The aim of this step is to specify the last inspection date for each DM (and review and record the condition status of the Component during the last inspection).
See Methodology Step 5 and Software Step 5.
The aim of this step is to specify the last inspection date for each DM (and review and record the condition status of the Component during the last inspection).
See Methodology Step 5 and Software Step 5.