Take Note
There are some specific cases where the S-RBI assessment approach in IMS PEI changes, depending on the Equipment/Component type.
This section gives guidance for Underground Piping.

Define Asset – Step 1

See Step 1.

Underground piping can be modelled with Component Type: "Piping UG".

Assign DMs to Component – Step 3

See Step 3.

The applicable Degradation Mechanism is: "Soil Corrosion (AR)".

RL – Step 6 & Step 11

See Step 6 and Step 11.

You can use the soil corrosion calculator.

IF – Step 11

See Step 11.

The Interval Factor is generated from the “full life” table.

Barrier Verification – Step 12 & Step 13

See Step 12 and Step 13.

Some of the NDE techniques to inspect these areas are smart pigging and guided wave technology.


Was this helpful? Click to add feedback comments

Changing your password will log you out immediately. Use the new password to log back in.
First name must have atleast 2 characters. Numbers and special characters are not allowed.
Last name must have atleast 1 characters. Numbers and special characters are not allowed.
Enter a valid email
Enter a valid password
Your profile has been successfully updated.
ESC

Eddy AI, facilitating knowledge discovery through conversational intelligence