Assigning Tests to Equipment Schedules

When the SIF design is Approved, the selected Tests (with their Test intervals) must be assigned to the associated Equipment’s Schedules to ensure the SIF achieve the Target PFD. This is typically not a task for the SIF designer.

Graphical user interface, text, application, email  Description automatically generatedAssign the Test with associated Test interval to a Schedule.