July 2022
Version 2022.2 brings updates to mainly existing features of IMS. With regards to IMS PEI it is mainly focused on Circuit improvements. Fabric Maintenance has also been further improved.
IMS 2022 Q2 Realization
IMS PEI:
| Features | Comments |
|---|---|
Circuit improvements | |
RBI | To do. |
Other PEI Enhancements | |
Fabric Maintenance (PEI, Civil):
| Features | Comments |
|---|---|
2D/3D | In progress. |
Addition development requests from GOM | |
PEI Improvements
This release does not bring methodology change for PEI but rather fixes and usability improvements.
Circuits Improvements
With regards to Circuits a “Passed” flag was added for the Remnant Life (RL).
Improved Color coding of the RL indicator
An additional (purple) RL flags has been added for Remnant Lives that have “Passed”.


Other PEI Enhancements
Other PEI improvements involved things like an improved 3D CML overview, import template standardization, etc.
Import Templates standardization
All the import templates were cleaned up to gain consistency in the naming convention.
Observations thumbnail shows multiple pictures
The observations thumbnail can now show 3 pictures (max), rather than just one. If there are more pictures attached, then three dots are displayed to indicate that there are more pictures.

Remove listed SPEC fields from the Rectifiers
Listed SPEC fields were removed from the Rectifiers:

Improve definition for RBI Data Quantification table
The definition for Stage 5 Equipment was updated to include "Stage 3 and Number of RBI equipment with Level 2 approved RBI schedules (AMS/MEC % of equipment with risk-based assessment”. This makes it clear that the Stage 3 requirements must be met to fulfil the MEC KPI%.

Improved CML Overview on the 3D model
The CML icons on the 3D model was replaced with new CML labels.

Update Schedules NID when Equipment placed in service
When an Equipment is set to “IN SERVICE”, the user is now asked a question:
"Do you want to update Start Date to today and recalculate Time Interval Date using Start Date of recurring not credited Schedules with no Last Inspection Date".
If the answer is “Yes”:
- The Start Date is set to Today; and
- For all recurring not credited Schedules with no LID:
- The Schedule Time Interval NID is updated with the Equipment’s Start Date + Interval; and
- If the Schedule was Approved, it will also be put back into draft.
If the answer is “No”:
The Schedule is not updated in any way (also not the Start Date).
Import Summary shows when data import is not allowed (17052)
When running an import, depending on user privileges a user will sometimes not be allowed to create certain data. However, in the past this information was not given to the user. Now this will show in the Import Summary.
Fabric maintenance (PEI, CIVIL)
The Fabric Maintenance functionality was updated based on requests from GOM.
Additional development requests from GOM
Inspection Schedules have been available for the FMA role, together with some other small improvements.
INSPECTION Schedules available for FMA role
INSPECTION Schedules are now also available for the FMA role.

Applicable Area on Schedule changed to hyperlink
Hyperlink functionality was added to the “Applicable Area” in the Schedule / CAIR Details Page.

Logic for Schedule’s Applicable Area updated
The logic for Applicable Area, shown in the Schedules Main Screen grid, has been updated: Now, when a Schedule is created directly from the Area Equipment, the parent Area Floc is automatically added as the Applicable Area. Note: This logic is only applied when new Schedules are created.

“Total Surface Area” on FMA Dashboard rounded to whole number
On the FMA Dashboard, the “Total Surface Area” values are now rounded to the nearest whole number and thus without decimals.