The Inspection Schedules is defined similarly to the CAIR Schedule, with 2 exceptions:
- An Inspection Schedule can be set to be recurring. This is done when the Schedule is created, or later in the Details Section. In this case a new Schedule will automatically be created when the Schedule is credited in an ECH.
.png?sv=2022-11-02&spr=https&st=2025-06-08T17%3A32%3A30Z&se=2025-06-08T17%3A43%3A30Z&sr=c&sp=r&sig=AhsKgiGnak1HNa%2FDroalCbBvn46Rjh%2FjwTgF8Qk33JE%3D)
- The Scope an plan codes Section has no Fabric Maintenance Checklist. Use the General Plan Codes and/or the Narrative to specify the work that is to be done.
.png?sv=2022-11-02&spr=https&st=2025-06-08T17%3A32%3A30Z&se=2025-06-08T17%3A43%3A30Z&sr=c&sp=r&sig=AhsKgiGnak1HNa%2FDroalCbBvn46Rjh%2FjwTgF8Qk33JE%3D)