Step 11 Review the Results – NID, MII, IS, Inspection Effectiveness:

Below the Step 11 Methodology is described. See also Software Step 11.

Understand Where Results Come From

For Age-Related DMs

  • IMS uses a "half-life" (or "full-life") table to determine an IF from the Criticality (Step 9) and the Confidence (Step 10). See Risk Based Inspection (RBI) - Theory.
  • The IF then determines the fraction of RL (Step 6) at which to inspect, i.e., the Maximum Inspection Interval (MII = IF x RL);
  • Then IMS determines the NID, from the MII and Last Inspection Date (LID) (Step 5). NID = MII + LID. The NID indicates the ultimate date by which the inspection Schedules should be completed. Schedules not inspected before NID should be recorded in the IMS as overdue.
  • Additionally, you must use the IF and RL to determine the required Inspection Effectiveness. See the table in Risk Based Inspection (RBI) - Theory.

For Non-Age-Related DMs

For more background, refer to Risk Based Inspection (RBI) - Theory.

Take note of the following:

  • The AR DM Inspections should be aimed at quantifying the rate of degradation (e.g., CR).
  • Legislation: A MII defined by local or national legislation may only be exceeded after approval by the regulatory body;
  • Lining/Coating: It is possible to take credit for Lining/Coating - see Step 6. This will extend the RL and, in turn, the MII (and NID) will be extended;
  • Unit Maximum RL: For each Unit, the Company can define a Maximum RL. If the calculated RL is greater than this value, the Company value will be used for determining the MII. See Configuring the Toplevel via Settings.
  • Negligible Criticality: For items with Negligible Criticality, the IF results in an inspection close to the end of the (inherently long) RL. This inspection should review the need for end of life replacement; and
  • Extreme Criticality: The IF table gives no IF for Extreme Criticality. In this case specific risk management is required; the risk cannot be managed to ALARP through inspection and IOW alone. For each individual case, specific actions, to reduce the risk to an acceptable level, should be identified. Process controls (e.g., down rating of pressure, temperatures), re-design (e.g., material upgrade) and dedicated specific inspection / proactive monitoring efforts are possible actions.

In general, take note of the following:

  • Here the effective strategy is to prevent (process) conditions under which the NAR DMs can initiate.
  • It should be ensured that the Inspection Schedule (see Step 12) matches the recommendation/strategy (analysis result) of S-RBI.
  • For low Confidence, the strategy aims at increasing Confidence and confirm the absence of damage. If that is not immediately possible, specific risk management should apply until integrity has been confirmed. Detailed analysis of the variables affecting the DM and their historical values should determine the scope and coverage of inspection. The IOW should be defined (see Step 2) and monitored (see Methodology Step 12 - proactive monitoring plan) to increase Confidence.
  • Medium to high Confidence: In this case, a proactive monitoring plan should be followed (see Step 12).
  • For lower Confidences and low Criticalities, improvement of the proactive monitoring plan should be considered (see Step 12).
  • Negligible Criticalities, or low Criticalities (with high Confidences), require no additional action.
  • Where applicable, Guidance per Special Emphasis Components and Guidance per DM should be followed (see se summary table below).

Required Inspection Effectiveness

The Required Inspection Effectiveness can be derived from the IF and RL. For pressure Equipment, the table given in Risk Based Inspection (RBI) - Theory should be used to determine the Required Inspection Effectiveness. The Required Inspection Effectiveness should then be used to determine specific inspection techniques and coverage. The table below gives an example for generalized corrosion morphology. For more guidance in this regard: refer to Guidance per Special Emphasis and Guidance per DM (see the summary table below).

The inspection technique and coverage, for General Thinning, to achieve a required Inspection Effectiveness:

Required Inspection Effectiveness
Intrusive Inspection
Non-Intrusive Inspection

A (Highly) Effective

(90% confidence)

50% visual examination of the surface accompanied by thickness measurements to establish a CR


Ultrasonic thickness measurement of profile radiography of 50-100% of susceptible areas as represented by the CMLs.

B (Usually) Effective

(70% confidence)

20% visual examination of the surface accompanied by thickness measurements to establish a CR

Ultrasonic thickness measurement of profile radiography of 20-50% of susceptible areas as represented by the CMLs.

C (Fairly) Effective

(50% confidence)

Any visual examination accompanied by thickness measurements to establish a CR

Ultrasonic thickness measurement of profile radiography of 5-20% of susceptible areas as represented by the CMLs.

D (Poorly) Effective

(30% confidence)

Any visual internal inspection.

Several thickness measurements and a documented inspection planning system.

E Ineffective

N/A

N/A

Specific Guidance Summary

Specific guidance summary - Interpreting results (NID, IS, Inspection Effectiveness):

DM / Special Emphasis Component
Description

Corrosive Deadlegs

  • Unstable IS (and MII) lookup table implemented in IMS.
  • For low Criticality, IMS advices normal RBI. Component Type can then be changed, and DM assigned.

Corrosive IP/MP

IS/MII lookup tables implemented in IMS.

Pressure Relief Devices 

Criticality directly drives the MII (MII lookup table implemented in IMS). Determined from highest Demand Scenario Criticality. For Criticality class E a redesign is advised.

Tanks

The IF is generated from the “full life” table.

Thermal IP/MP

IS/MII lookup tables implemented in IMS, based on Criticality and Confidence. Some additional notes.

Required Inspection Effectiveness – examples of Non-Intrusive Cracking Inspection (Thermal Fatigue for T3 and T5 TMPs) and Non-Intrusive Cracking Inspection (Thermal Fatigue for T3 and T5 TMPs).

Underground Piping

The IF is generated from the “full life” table.

Stress Corrosion Cracking (SCC)

MII – explanation of the 3 lookup tables implemented in IMS (slow acting, moderate acting, fast acting).

IS – explanation of the 2 lookup tables implemented in IMS (slow/moderate and fast acting).

Amine Stress Corrosion Cracking

Required Inspection Effectiveness – examples of intrusive and non-intrusive inspections for categories A and B. 

Corrosion Under Insolation (CUI)

NID – explanation of how the DCA and ECR is used (CUI-CS) or MII lookup (CUI-SS).

IS – lookups implemented in IMS, – guidance for Inspection coverage per IS. 

Required Inspection Effectiveness – lookup to determine inspection technique and coverage based on category. 

Reference to CUI/external management around CMLs. 

High Temperature Hydrogen Attack (HTHA)

MII –implemented lookup table in IMS.

Hydrogen Induced Cracking HIC/SOHIC

MII – additional notes on the implemented lookup table in IMS. 

IS –implemented lookup table in IMS.

Required Inspection Effectiveness - examples of intrusive and non-intrusive inspections for categories A – E. 

Lean Amine Corrosion

Required Inspection Effectiveness - lookup to determine inspection technique and coverage based on category (localized thinning). For general thinning the above table can be used.

Rich Amine Corrosion

Required Inspection Effectiveness - lookup to determine inspection technique and coverage based on category (localized thinning). For general thinning the above table can be used.








Was this helpful? Click to add feedback comments

Changing your password will log you out immediately. Use the new password to log back in.
First name must have atleast 2 characters. Numbers and special characters are not allowed.
Last name must have atleast 1 characters. Numbers and special characters are not allowed.
Enter a valid email
Enter a valid password
Your profile has been successfully updated.
ESC

Eddy AI, facilitating knowledge discovery through conversational intelligence