PEI: Main RBI applied to "Non-Storage Tanks"

IMSFB-37107

Equipment of type Tank can be marked as "Non Storage Tanks". In this case not the Tank RBI methodology applies, but rather the main RBI methodology. Therefore, in the case that an RBI Analysis has already been done, the user will be prompted to map the Tank DMs to normal DMs. In addition, the Confidence and StF will be reset so that the Tank can be assessed with the Main RBI methodology like a "normal" Equipment, with the half life IF table.

In case there are some issues you will get a warning with additional instructions. 

Validation is added in a case when a Non-Tank Degradation Mechanism is attempted to be assigned to a Tank Component.

User Instructions

To learn how to mark a piece of Equipment as a Non-Storage Tank Equipment see: Tank Equipment.

To learn more about Tank RBI see: Tanks - Degradation Management.

To learn more about Main RBI see: Degradation Management Implementation - Overview.

General: Schedules and ECHs standardized across Discipline

Schedules and ECHs are now aligned across Disciplines. For this the RCM Schedules and ECHs were updated. 

Aligning RCM Schedules and ECHs with Schedules and ECH across Discipline

IMSD-34280

The RCM Schedules and ECHs have been aligned with the general IMS Schedules and ECH, that are now being used across all Disciplines. 

  • RCM now have both the ECH and Schedules Main Screens. The grids are aligned with those in PEI, except for some minor adjustments. For instance RCM Schedules shows Source, but no NID timeline. The grids show all ECHs / Schedules (PEI, RCM, CIVIL, PLSS, TAT, FMA) from Equipment that are visible in RCM.
  • Also the PEI Equipment Detail Pages, Schedules Main Screen, and ECH Main Screen now show RCM Discipline Schedules and ECHs.
  • The RCM Schedule and ECH Details Pages have also been aligned with the PEI Details Pages, with some minor adjustments. Like the ECH Details Page show the Corrective Work Order / Predictive Work Order section and RCM Schedules don't show RBI information, Plan Codes or Tasks.
  • It is also possible to create Schedules and ECHs from RCM. The Schedules creation screen have been updated to show relevant Schedules Types and Schedule Drivers. In RCM Schedules and ECHs can be created on either FLOC or Equipment level.

User Instructions

Schedules and ECHs pre-filtered by Discipline

IMSD-34283

By default, Schedules and ECHs are now pre-filtered by the Discipline(s) set for the user, on all FLOCs and Equipment. For RCM only four Disciplines can be pre-selected by default in RCM: "Electrical", "Instrumentation", "NRB" and "RCM".

User Instructions
To learn more about Disciplines see: Schedules and ECHs across Discipline and RCM Schedules.

RCM Schedule Roles updated

IMSD-34281

IMSFB-37645

The RCM Roles have been updated with regards the Schedule rights. The following Roles were updated: RCM Schedule Custodian, RCM Custodian, RCM Global RSL Custodian, RCM Admin. The CSA already had Schedule rights. Note: The RCM ECH Custodian cannot Approve Schedules. The Role Rights spreadsheet has been updated to reflect this correctly.

User Instructions
To learn more about the RCM User Roles see: RCM User Roles.

RCM: Condition History Main Screen shows basic CMMS data

IMSFB-12517

New columns, showing basic SAP data, were added to the Condition History Main Screen grid. These do not show by default, but can be added via the settings button.

User Instructions
To learn how to show these columns in the ECH Main Screen see: ECH Main Screen and RCM Equipment Condition Histories.

RCM: WO Operations and WO Costs added in ECH

IMSFB-13805

The RCM SAP Work Order Operations and Work Order Costs were added to the Condition History Details Page as two tabs.

User Instructions
To learn more about the ECH Details Page and the the Work Order section see: Step B: Detailing ECHs and RCM Equipment Condition Histories.

PLSS: Flexible Flowline and Flexible Riser Equipment Groups Added

IMSFB-15211

IMSFB-35838

We have added new Equipment groups and FLOC types for PLSS:

  • FLEXIBLE FLOWLINE-FLOC
    • Equipment group: Flexible Flowline
  • FLEXIBLE RISER-FLOC
    • Equipment group: Flexible Riser

For BLP sites, the following new object types are created and mapped to the Equipment group:

  • PIFG – FLANGE
  • PLFF – FLEXIBLE FLOWLINE
  • SUCM – SCM
  • SUVC – PLSS CHOKE
  • VACC – CRITICAL CHECKVALVE
  • VARE - VALVE
User Instructions
To learn more about Equipment groups and FLOC Types in PLSS see: Creating New PLSS Equipment.

PLSS Checklists: IOW Review

IMSFB-32911

This version sets the floor for Dynamic forms in PLSS. The journey starts with the IOW Review checklist as the first out of ∽20 potential checklists for PLSS.

User Instructions
To learn more about using Dynamic Form Checklists see: Using Dynamic Forms.